28 Assembly process No. Installation of chassis (1/3) A-1 1) Lay the 2 sets of track shoe assembly in parallel Fig. 1 on the machine assembly place. (Fig. 1, Fig. 2) a Distance between track shoe assemblies: 2,500 mm (Fig. 2) a Set the directions and positions properly. Weight of each side (Shoe width: 610): 4,300 kg Number of shoes: 41 pieces/side ‚q ‚e Overall length: 11.5 m Left track Fig. 2 2) Place the 2 stands to set (place) the machine between the right and left track shoe assem- blies. (Fig. 3) For the stands, see "Field assembly jigs and Front Parallel tools list" in this manual.
Right track a One of the stands is for the front of the ma- Front chine (967 mm high) and the other is for the end rear of the machine (952 mm high). Set the upper stopper of the stand for the front of the machine forward. Fig. 3 a Place the front stand at 6,700 mm from the front end of the track shoe assembly and place the rear stand further 2,900 mm back- ward. (L1 and L2 in Fig. 3) Precautions Necessary tools Necessary equipment This work is required for disassembly to 32-t parts for transportation. Name Q'ty Name Q'ty ø20 × 2,000 mm 2 50-ton crane 1 Wire rope sling Support stand (front) 1 Support stand (rear) 1 Other remarks