30 Assembly process No. Installation of chassis (3/3) A-1 Install 1 and 2 wire rope slings to the front and rear of the machine respectively as shown in (Fig. 4) and sling the machine with 2 truck cranes (Install the front slings to 1 truck crane and install the rear slings to another truck crane). Unload the machine from the trailer and place it on the chassis stand installed on the ground. a Install the front wire rope sling to the tow hook installed to the undercover of the machine through a proper shackle. If the sling interferes with the machine at this time, put a rubber or felt pad between the sling and machine to protect the machine.
a Install the rear wire rope slings to the ripper tilt cylinder mounts installed to the machine. Install each sling to the pin installed to each of the right and left mounts. a Place the equalizer bar installed to the machine onto the front chassis stand and place the hull frame (main frame of the machine) onto the rear chassis stand. At this time, check that the chassis stands are at the lateral center of the machine. a Before loosening the sling tension, put wooden block (13) between equalizer bar (9) and machine main frame (10) on each of the right and left sides as shown in (Fig. 5). Fig. 5 Section : 95 mm square Length :
180 – 200 mm a Steel blocks of the same shape may be used instead of the wooden blocks. (9) Equalizer bar (10) Machine main frame (11) Front chassis stand (13) Wooden block