32 Assembly process No. Installation of pivot shaft (1/2) A-3 Note) This work is required for disassembly to 32-t Fig. 1 parts for transportation. 1) Slinging pivot shaft • To sling the pivot shaft, install the sling as shown in (Fig. 1). • A proper length of the sling wire is about 600 mm. Dimension (A) in (Fig. 1) • Install the sling wire to about 500 mm from the pivot shaft end. Dimension (B) in (Fig. 1) Part Nos. of pivot shafts Right shaft Left shaft Dual 195-50-42111 195-50-42111 Single 195-50-42111 195-50-42210 2) Setting position of pivot shaft * For details of installation, see the following page. Fig. 2 • Set the pivot shaft to the machine with its flange directed as shown in (Fig.
2). 3) Bolting to machine • When installing the pivot shaft, tighten the bolts lightly and evenly in the diagonal order to press fit the spigot joint portion until the flange face is seated. • Use an impact wrench (– 306 kgm) and a socket shown in the following table. (See [Fig. 3]) • While turning the torsion seal cover properly, tighten the bolts. Note: After tightening, be sure to check the tight- ening torque. Fig. 3 01010-83000 Part No. of bolt (14 pieces each on right and left) 01643-33080 Part No.
of washer (14 pieces each on right and left) Bolt specification M30 × 100 mm Socket 46 mm 1,720 ± 196 Nm Tightening torque (175 ± 20 kgm) Tilt hose 4) Installation of cork plug After tightening the above bolts, drive the cork plugs into the screw bolt holes in which the bolts of the pivot shaft flange will not be installed. Part name Part No. Q’ty 2 pieces each on Plug 07049-03038 right and left Right shaft Left shaft Dual 195-50-42111 195-50-42111 Single 195-50-42111 195-50-42210 Part No. of bolt 01010-83000 (14 pieces each on right and le ft) Part No.
of washer 01643-33080 (14 pieces each on right and le ft) Bolt specification M30 × 100 mm Socket 46 mm Tightening torque 1,720 ± 196 Nm (175 ± 20 kgm) Part name Part No. Q’ty Plug 07049-03038 2 pieces each on right and left