Kaiyi D375A-6 — A-4 Installation of undercarriage

39 Assembly process No. Installation of undercarriage (6/27) A-4 1.7.4) Place grease cover (8) on the equalizer bar side pin inserted in advance and fix it with mounting bolts (9) and (10) temporarily. (Fig. 13) Fig. 13 Note 1. Install "O-ring (7)" to the grease cover which will be in contact with the equalizer bar side pin head without fail. 2. Install the grease cover to the shape of the equalizer bar side pin head. Part No. of grease Left 195-50-52360 (1 piece) cover (8) Right 195-50-52370 (1 piece) Part No. of O-ring (7) 07000-12020 (1 piece each on right and left) (7), (8), (9) and (10) removed in (Fig. 1) and Part No. 01010-81665 (4 pieces each on right and left) Bolt (9) (Fig.

2) Specification M16 × 65 mm Part No. of washer (10) 01643-31645 (4 pieces each on right and left) 1.7.5) Connect the grease tube (A) coming from the equalizer bar to the grease cover. Note: The tube joint has pipe threads. Take care not to tighten it too much. The reference tightening torque is shown below. Tightening torque 14.7 – 34.3 Nm {1.5 – 3.5 kgm} 1.8) Place jacks or wooden blocks under the installed track frame assembly so that the assembly will not tip over when it is lowered from the crane. (Fig. 14) Jack Place the jacks or wooden blocks to at least 2 places so that the track frame assembly Fig. 14 will be kept horizontally in each direction.

1.9) Lower the track frame and start the installation work of the track frame assembly on the opposite side. Part No. of grease cover (8) Left 195-50-52360 (1 piece) Right 195-50-52370 (1 piece) Part No. of O-ring (7) 07000-12020 (1 piece each on right and left) Bolt (9) Part No. 01010-81665 (4 pieces each on right and left) Specification M16 × 65 mm Part No. of washer (10) 01643-31645 (4 pieces each on right and left) Tightening torque 14.7 – 34.3 Nm {1.5 – 3.5 kgm}