Kaiyi D375A-6 — A-4 Installation of undercarriage

41 Assembly process No. Installation of undercarriage (8/27) A-4 2) Assembly of pivot shaft end 2.1) Right and left sides of dual tiltdozer and right side of single tiltdozer Fig. 18 No. Part name Part No. Q’ty Remarks 40-1 Inner washer 195-50-52120 1 40-2 Outer washer 195-50-52130 1 Assembled already 40-3 Torsion seal 195-50-22181 1 41 Bolt 01010-81690 8 42 Washer 01643-51645 8 43 Bolt 01010-81645 3 44 Washer 01643-51645 3 45 Spacer 195-50-22170 1 71 O-ring 07000-15155 1 72 O-ring 07000-15250 1 73 Pivot shaft – – 74 Track frame assembly – – 75 Hydraulic hose – – See Assembly procedure 76 Hydraulic hose – – A-5 No. Part name Part No.

Q’ty Remarks 40-1 Inner washer 195-50-52120 1 Assembled already 40-2 Outer washer 195-50-52130 1 40-3 Torsion seal 195-50-22181 1 41 Bolt 01010-81690 8 42 Washer 01643-51645 8 43 Bolt 01010-81645 3 44 Washer 01643-51645 3 45 Spacer 195-50-22170 1 71 O-ring 07000-15155 1 72 O-ring 07000-15250 1 73 Pivot shaft – – 74 Track frame assembly – – 75 Hydraulic hose – – See Assembly procedure A-5 76 Hydraulic hose – –