59 Assembly process No. Installation of undercarriage (26/27) A-4 12) Removal of bogie fixing jig of machine with full roller guard (optional) Fig. 40 No. Part name Part No.
Q'ty Remarks * 1 Plate 195-30-69860 3 each on right and left 2 Collar 198-30-66190 3 each on right and left Parts to be removed 3 Washer 19M-54-11770 3 each on right and left 4 Bolt 01011-62410 3 each on right and left * 5 Bolt 01010-62460 3 each on right and left Parts to removed and installed 6 Washer 01643-32460 3 each on right and left to different places 7 Plate 195-30-69540 1 each on right and left 8 Collar 195-30-69550 1 each on right and left 9 Washer 19M-54-11770 2 each on right and left Parts to be removed 10 Bolt 01011-62410 1 each on right and left 11 Bolt 01011-62420 1 each on right and left • Parts marked with * are different from those of track frame assembly of standard specification ([Fig.
38]). 12.1) Remove parts (1) – (11) shown in (Fig. 40). (These parts are installed to 4 places each on the out- side of the track frame assembly, thus they are installed to 8 places in total on the right and left track frame assemblies.) No. Part name Part No.
Q'ty Remarks 1 Plate 195-30-69860 3 each on right and left Parts to be removed 2 Collar 198-30-66190 3 each on right and left 3 Washer 19M-54-11770 3 each on right and left 4 Bolt 01011-62410 3 each on right and left 5 Bolt 01010-62460 3 each on right and left Parts to removed and installed to different places 6 Washer 01643-32460 3 each on right and left 7 Plate 195-30-69540 1 each on right and left Parts to be removed 8 Collar 195-30-69550 1 each on right and left 9 Washer 19M-54-11770 2 each on right and left 10 Bolt 01011-62410 1 each on right and left 11 Bolt 01011-62420 1 each on right and left