Kaiyi D375A-6 — A-9 Installation of ripper

72 Assembly process No. Installation of ripper (6/7) A-9 7. Piping of pin puller cylinder 1) Connect the pin puller cylinder hoses as shown in figures. a For the hose clamps, see the detailed figures. a Run the engine, operate the ripper (lifting, tilting and retraction of pin puller) and check that each hose moves freely. • Hose: 49 ± 19.6 Nm {5 ± 2 kgm} No. Part name Part No. Q'ty Remarks 1 Hose 02760-00326 2 2 Plate 195-78-72571 1 3 Sems bolt 01024-81240 2 4 Yoke 144-947-2850 1 5 Pin 04205-11028 1 6 Pin 04050-13015 1 7 Cushion 07095-00314 6 Machine without ripper point light uses only four. 8 Clamp 07094-30315 6 Machine without ripper point light uses only four.

9 Sems bolt 01024-81065 3 Machine without ripper point light uses only four. No. Part name Part No. Q'ty Remarks 1 Hose 02760-00326 2 2 Plate 195-78-72571 1 3 Sems bolt 01024-81240 2 4 Yoke 144-947-2850 1 5 Pin 04205-11028 1 6 Pin 04050-13015 1 7 Cushion 07095-00314 6 Machine without ripper point light uses only four. 8 Clamp 07094-30315 6 Machine without ripper point light uses only four. 9 Sems bolt 01024-81065 3 Machine without ripper point light uses only four.