78 Assembly process No. Assembly of blade (3/16) A-11 [3] Sling the straight frame horizontally with belt slings. (Fig. 9) Fig. 9 Belt sling • Lifting load: Approx. 1,400 kg/piece on each side • Belt sling: 50 mm wide, 4 m long (2 pieces) a If the straight frame slants to the right or left, the joint described in [1] will not be inserted in the bracket yoke easily. Connection Wooden block Accordingly, keep the straight frames horizontally. Reference: A belt sling means a belt made of [4] While slinging the straight frame, insert synthetic fibers used to sling heavy the joint at its end in the bracket yoke on things.
It is used to prevent damage the blade and align the connecting pin on the products and protect the holes. (Fig. 9) paint during sling work. [5] Insert pin (81) removed in step [2] and fix it to the bracket on the blade with lock (83), bolt (84) and washer (85). (Fig. 9) [6] Set a wooden block under the rear end of the straight frame (on the opposite Fig. 10 side to the joint) and adjust the height of the trunnion mounting portion (center) of the machine above the ground to 940 – 960 mm. (Fig. 10) a Wooden block: T300 mm × length 700 mm – 1 piece [7] Perform steps [1] – [6] on both right and left sides.
[8] Sling the straight frames again and set the right and left straight frames symmet- Fig. 11 rically about the blade and adjust the dis- tance between both straight frames (dimension W) to approx. 3,700 mm. (Fig. 11) a Clean each connecting part.