Kaiyi D375A-6 — A-11 Assembly of blade

86 Assembly process No. Assembly of blade (11/16) A-11 [2] Remove the covers and hydraulic cylin- Fig. 25 der mounting pin (41) installed to the tilt hydraulic cylinder mounting section of the right straight frame. (Fig. 25) Bolt specification Tool (Socket) M12 19 mm M20 30 mm [3] While slinging tilt hydraulic cylinder (31) with belt sling (20), with the hydraulic hose cover side down, align the mount- ing pin hole on the bottom side (clevis side) with that of the straight frame. Then, insert mounting pin (41) removed in step [2] and fix it to the straight frame with lock (42), bolt (43) and washer (44). (Fig. 25) • Sling weight (Weight of hydraulic cyl- Fig. 26 inder assembly) Approx.

300 kg Bolt specification M20, Length : 50 mm Tool (Socket) 30 mm See Table 1 "Tightening Tightening torque torque" [4] Set a wooden block between hydraulic cylinder (hydraulic hose protection cover) and straight frame so that the hydraulic cylinder (31) will be positioned as shown in (Fig. 26), and then loosen and remove the sling. a Do not connect the head side of the hydraulic cylinder (31) part R in (Fig. 26) at this time. Connect it after installing the blade assembly to the machine. See “assembly procedure A-12” Fig. 25 Bolt specification Tool (Socket) M12 19 mm M20 30 mm Fig. 26 Bolt specification M20, Length :

50 mm Tool (Socket) 30 mm Tightening torque See Table 1 "Tightening torque"