90 Assembly process No. Assembly of blade (15/16) A-11 [5] While slinging brace assembly with the Fig. 33 belt sling, with the handle (70) up, align the mounting pin hole of the brace assembly with that of the straight frame. Then, insert mounting pin (55) removed in step [1] and fix it to the straight frame with lock (56), bolt (57) and washer (58). (Fig. 33) • Sling weight (Weight of brace assem- bly) Approx. 190 kg Bolt specification M20, Length :
50 mm Tool (Socket) 30 mm See Table 1 "Tightening Tightening torque torque" [6] While still slinging the brace assembly with the belt sling (21), align the mount- ing pin hole on the opposite side of step [5] with the mounting pin hole of the If brace (63) is rotated with lever (73) blade. to adjust dimension L, the direction of handle (70) changes. According, do a At this time, if the mounting pin holes not apply this method. cannot be aligned because of dimen- sion L adjusted in step [4], rotate screw (67) one half by one to adjust dimension L finely while locking brace (63).
Then, insert mounting pin (59) removed in step [2] and fix it to the blade with lock (60), bolt (61) and washer (62). (Fig. 33) Bolt specification M20, Length : 50 mm Tool (Socket) 30 mm See Table 1 "Tightening Tightening torque torque" [7] Loosen and remove the sling. Fig. 3 Fig. 3 3 Bolt specification M20, Length : 50 mm Tool (Socket) 30 mm Tightening torque See Table 1 "Tightening torque" Bolt specification M20, Length : 50 mm Tool (Socket) 30 mm Tightening torque See Table 1 "Tightening torque"