Komatsu — INSPECTION AND REPAIR

OPERATION 2 INSPECTION AND ADJUSTMENT Properly adjust track tension. Tension should be measured at clearance shown in the diagram - usually 50 to 63 mm (2 to 2.5 in) at this point. For rocky terrain, tighten tracks slightly. In clay or sandy areas, slightly loosen them. For inspection and adjustment procedures, see “CHECK AND ADJUST TRACK TENSION” on page 3-30. Check idler rollers for oil leakage and loose bolts. If any trouble is de- tected, repair immediately. Check the clearance between the idler guide plate and the track frame. If clearance increases, the idler may develop side motion and the tracks may come off.

2 INSPECTION AND REPAIR Frequent inspection and prompt repair will reduce repair costs. The fol- lowing items for inspection will serve as a guide to maintenance service of each undercarriage part. Perform periodical inspection and contact the distributor in your area when machine has approached repairable limits and reversing limits. 2 Measuring Link Pitch 1. Insert a wooden block between track shoe and sprocket to take up the slack in track shoes. 2. Measure pitch length of four links in stretched portion. The link pitch is ј of the length measured. D87E-2 D87P-2 2-79