Hitachi Construction Machinery — 450-RTF.indb

ASSEMBLING INSTALLING COUNTERWEIGHT WARNING: Never allow anyone to enter into the area under the lifted counterweight. 1. Lift counterweight using a crane. 2. Insert the convex bosses of counterweight into the holes on base machine. 3. Apply a film of grease to two counterweight mounting bolts(10). Install two bolts (10), each two washers (8) (9), two nuts (7) and shim (6). Tighten counterweight mount- ing bolts (10) by power wrench. Tightening torque: 2400 N•m (240 kgf•m, 1735 lbf•ft) Counter Weight 4. Install shims (4), (5), plates (3), lock washers (2), and bolts (1). Tightening torque: 450 N•m (45 kgf•m, 325 lbf•ft) W1J1-02-02-001 NOTE:

If any gap exists between plates (3) and bracket, fill the 1 gap with shims (4), (5). 8 7 6 5 4 3 2 5. Install covers (11), (12) with each 11 pieces of spring washers (14) and washers (15). Tighten bolts (13). 4 3 2 1 5 7 8 9 12 10 15 13 14 15 11 13 14 W1J1-02-02-002 8 9 7 3 1, 2 10 Convex Bosses 4, 5 Bracket M1J1-06-016 6-5