Hitachi Construction Machinery — 0703D46ZW180_220_250_310

TRANSPORTING Loading/Unloading CAUTION: Pay attention to the following points. Steering on a ramp is hazardous. Never attempt to steer the machine on a ramp. Personal injury or death may result due to loss of machine stability. If the travel direction must be changed on a slope, move back the machine to the flat ground of flat- bed. Then, after changing the travel direction, be- gin to drive again. Be sure to turn the travel F-N-R shift switch to the LOW position. Loading 1. Load the machine so that the machine width center aligns with the trailer deck width center. 2. Slowly drive the machine on the ramp. 3. Lower the bucket onto the trailer deck. 4. Stop the engine.

Remove the key from the key switch. 5. Operate the loader control lever several strokes to relieve pressure in the cylinders. 6. Place the pilot control shut-off lever in the LOCK position. 1 Front Attachment Side 7. Securely close the windows and cab door to protect the cab from rain. Put a cover over the opening of the ex- haust pipe. M4GB-01-136 8. Install the articulation lock bar (1) to prevent the machine from articulating. 6-2