Fendt 900 Vario COM III — 2 2V5 purge valve (function)

I002166 Fig. 2. I002167 Fig. 3. I002168 Fig. 4. I002169 Fig. 5. 919 .. 0101-1000 925 .. 1001- 934 .. 0101-1000 919 .. 1001- 928 .. 0101-1000 934 .. 1001- 922 .. 0101-1000 928 .. 1001- 922 .. 1001- 931 .. 0101-1000 925 .. 0101-1000 931 .. 1001- Piston is held in mid-position by spring force. Both chan- nels ( A, B ) are closed. Channel B is connected to T . Hot oil can flow from the low pressure side B via T to the discharge connection and to the oil cooler. Channel A is connected to T . Hot oil can flow from the low pressure side A via T to the discharge connection and to the oil cooler. Opening pressure: delta p = 7 bar between A and B Piston is pushed to the left via control drilling XB .

2 2V5 purge valve (function) Piston is pushed to the right via control bore XA . 1080 - Transmission/drive train A - General Pressure at A, B max. 550 bar Pressure at T max. 50 bar Transmission in "neutral" pA = pB, delta p pA > pB, delta p > 7 bar pA 7 bar 8 T000753 Version 1 07-11-2007 "Tractive mode" "Pushing mode" A - General