1200 - Transmission/front PTO C - Documents and diagrams I003561 Fig. 3. 9 T001206 Version 1 07-11-2007 2 Technical drawing: front PTO drive 919 .. 0101-1000 925 .. 1001- 934 .. 0101-1000 919 .. 1001- 928 .. 0101-1000 934 .. 1001- 922 .. 0101-1000 928 .. 1001- 922 .. 1001- 931 .. 0101-1000 925 .. 0101-1000 931 .. 1001- A.) Greased screw seat Assembly sequence: 1. Tighten axial bolts (tightening torque = 220 Nm) 2. Tighten radial bolts (tightening torque = 220 Nm) B.) For drive belt change: Loosen the radial bolts and slide the bush forwards C - Documents and diagrams