1220 - Transmission / Live PTO G - Repair I003675 Fig. 32. I003676 Fig. 33. I003643 Fig. 34. I003641 Fig. 35. 21 T001259 Version 1 07-11-2007 Clean the flange surfaces. Ensure that the two locating pins (arrowed) are fitted. Coat flange surface with X 903.050.074 surface sealant. Fit and grease four new O-rings for the pressure connec- tions (arrow). Secure the housing cover in the hoist and fit the rear axle housing. Tighten the fixing bolts and nuts M18 with 400 Nm . Plug in the X169 separation point at the B020 rear PTO stub shaft sensor Plug in the X170 separation point at the B021 rear PTO clutch speed sensor 919 .. 0101-1000 925 .. 1001- 934 .. 0101-1000 919 .. 1001- 928 ..
0101-1000 934 .. 1001- 922 .. 0101-1000 928 .. 1001- 922 .. 1001- 931 .. 0101-1000 925 .. 0101-1000 931 .. 1001- W ARNING : Do not walk or stand under sus- pended loads! Place the existing shims (1) in the upper bore. Attach the compressed air couplings N OTE : Determining the shim (1) Replenish transmission oil Attach the trailer hitch see §2 G - Repair