MH MH6.6/MH8.6 — GB COPERTINA.fm

8-40 REPAIR INSTRUCTIONS MH6.6 / MH8.6 Fitting the ball-bearing slewing ring - Slew the slewing ring with the crane over the undercarriage and let it hover above the contact area without lowering it at this time. Turn in at least three new screws (4) with spacers (6) as a guiding aid. - Remove the corrosion protection lining when a new slewing ring is to be installed. - Clean all surfaces on the superstructure and the undercarriage thoroughly. The contact faces must be metallically bright, dry and free from grease. Remove any surface irregularities and burrs. - Let down the slewing ring carefully. - Detach the lifting gear from the slewing ring.

- Insert the new screws with spacers and tighten crosswise with a torque wrench. - Clean the bores in the undercarriage. Clean the threaded holes in the superstructure carefully, check the threads and rethread if they are dam- aged. - Mark the tightened screws. - Tightening torque M A =250 Nm - Now apply adhesive also on the contact surface of the superstructure. - Apply adhesive on the contact surface of the undercarriage using a paint roller, a hard brush or a plastic spatula. - Apply a thick layer of grease on the slwewing ring toothing until the gaps between the teeth are filled with grease. Prevent the adhesive from getting into the bores:

adhesive in the threads leads to higher friction and thus to wrong tightening torque results. - Slew the superstructure with a crane over the undercarriage and let it hover over the slewing ring without, however, lowering it at this time. - Lower the superstructure further, engaging the pinion in the toothing. - Turn in at least three new screws (3) with spac- ers (5) as a guiding aid. - Lower the superstructure carefully. - Insert the remaining new screws with spacers and tighten crosswise with a torque wrench. - Tightening torque M A =250 Nm - Mark the tigtened screws. - Refit the rotor. - Reconnect all hydraulic lines to the rotor. - Detach the lifting gear from the superstructure. Fig.

4 - Attach the new slewing ring to the lifting gear. - Fill and bleed the hydraulic system, put the ma- chine into operation and check all hydraulic lines at the rotor for leaks and tigthness. - Turn the inner and the outer ring so that the "S" marking on the outer ring is at 90 degrees to the direction of travel and that the "S" marking on the inner ring is located opposite (Fig. 6). - The adhesive between the slewing ring and the superstructure and undercarriage increases the resistance of the bolted joints and seals at the same time the joint gaps. Slewing rings are induction-hardened.

The "S" – markings designate the area between the begin- ning and the end of the hardened part of the race which, due to hardening constraints, could not be hardened. - The adhesive hardens under exclusion of air. - The adhesive is fully hardened after about 6 hours. The machine should not be loaded be- forehand. For this reason, the slewing ring is intentionally installed in such a way that these areas are lo- cated outside the zones of main stress. Carefully read personal and machine SAFETY INSTRUCTIONS (at the beginning of this manual)