MH6.6 / MH8.6 REPAIR INSTRUCTIONS 8-87 Refitting the outriggers - Position the outrigger arm (2) with a crane in the frame of the undercarriage and fit pin (9) with washers (10) and (11) and screw (12). Fill the hydraulic reservoir up to the prescribed level with hydraulic oil. - Make sure the clearance between frame and outrigger arm is less than 1 mm and correct it with shims, if necessary. Let the engine run at idling and check the hose connections for oil leaks. - Position the baseplate (3) on outrigger arm (2) and fit pin (4) with washers (5) and (6) and screw (7). Bleed the hydraulic circuit.
- Lift cylinder (1) with a crane and align the eye of the piston rod with the bore in the outrigger arm (2). - Make sure the clearance between arm and baseplate is less than 1 mm and correct it with shims, if necessary. - Position cylinder (1) in the frame and fasten it with pin (18). To facilitate the aligning operation, move the the rod of the outrigger cylinder with the control lever into the correct position. - Secure the pin with washer (19) and screw (20). - Connect the hydraulic hoses to the cylinder and bleed the hydraulic system. To do so, extend and retract the piston rod of the cylinder slowly sev- eral times.
- Fit pin (16) and secure it with washers (14) and disks (15) and the screws (13). Carefully read personal and machine SAFETY INSTRUCTIONS (at the beginning of this manual)