MH MH6.6/MH8.6 — GB COPERTINA.fm

8-100 REPAIR INSTRUCTIONS MH6.6 / MH8.6 Dismantling the boom cylinder - Remove retaining screws (8) of rod guide (7). (14 mm Allen key) - Drive rod guide (7) with a plastic hammer out of cylinder barrel (12). - Attach piston rod (11) to special tool (W004). Mark the position of adjusting nut (24) with re- spect to piston rod (11). - Remove retaining screw (22) and ball (23) from nut (24). (6 mm Allen key) IMPORTANT: Remove the two toe-ins on retain- ing screw (22), which were applied after tigthening of the screw with hammer and chisel by reboring. - Loosen nut (24) and screw off using special tool (W004) and the 95 mm (MH6.6) / 100 mm (MH8.6) hex socket insert.

Before dismantling, read all safety and working instructions in the corresponding chapter. - Lift the cylinder with a crane onto a workbench and fix in horizontal position. - Withdraw piston (15), spacer disk (21) and damper bearing (13) from piston rod (11). With- draw also damper seal (14). - Drain off all the hydraulic oil from the cylinder into a suitable recipient. - Withdraw seal (17), guide rings (19) and (20), O-ring (18) and the two backing rings (16) from piston (15). - Withdraw now also rod guide (7) from piston rod (11). - Withdraw O-ring (10) and backing rings (9) and (2) from the rod guide.

- Then, remove scraper ring (1), lip seal (3), damper ring (4), retaining ring (6) and bushing (5) from the rod guide using special tool (W005). Fig. 3 When drawing out the piston rod, make sure not to damage the seals and guides by jamming the rod. - Pull out piston rod (11) of the cylinder to the limit stop securing the end of the rod with a sling at- tached to a crane. Carefully read personal and machine SAFETY INSTRUCTIONS (at the beginning of this manual) 14 mm Allen key 6 mm Allen key Plastic hammer 95 mm hex socket insert 100 mm hex socket insert Special tool (W004) see list of special tools Special tool (W005) see list of special tools