MH MH6.6/MH8.6 — GB COPERTINA.fm

8-104 REPAIR INSTRUCTIONS MH6.6 / MH8.6 Removing the stick cylinder - Place the equipment safely on the ground and secure the machine against inadvertent move- ments. Fig. 3 - Shut off the engine. - Drive out pin (3) with a brass drift and a ham- mer, removing spacers (4) at the same time. - Secure the machine against inadvertent starting, e.g. with a warning sign attached to the ma- chine. - Move the piston rod fully into the stick cylinder and secure it to the cylinder barrel to prevent it from moving. - Place a piece of squared timber between stick cylinder and boom. - Remove the leakage oil lines, if any (1).

- Shut off the engine and depressurize all hydrau- lic components by moving the cylinders with the control levers gently in both directions, the en- gine being off, but the ignition on. - Detach the hoses from the pipes and close the hose, pipe and cylinder openings with plugs. Fig. 2 - Remove screw (2) which fixes pin (3) to the stick. Fig. 4 - Remove screw (5) which fixes pin (6) to the boom. Weight of the boom cylinder: - Drive out pin (6) with a brass drift and a ham- mer, removing spacers (7) at the same time. 270 kg MH6.6 280 kg MH8.6 - Lift the stick cylinder with a crane.

Wear protective equipment such as goggles and helmet to protect yourself against metal splinters resulting from hammering. Carefully read personal and machine SAFETY INSTRUCTIONS (at the beginning of this manual) 19 mm 36 mm Hammer Brass drift