Doosan P086TI — Doosan P086TI User Manual

' (2) Loosen the drive gear fixing bolt of injection pump a bit. (3) After turning slowly the coupling of injection pump ae until the fuel will drop from #1 plunger at the rate of a drop for 6 ~ 8 sec., tighten the driving gear fixing bolt of fuel pump. ; @ After the adjustment of injection timing, disassemble the “U” shape pipe, readjust o EAQM3016 the delivery valve and the valve spring. > @ Turn the coupling until the notch mark of the indicator plate injection pump ? attached to the fuel is aligned with the notch mark of the coupling. ri. ay] @® Tighten the Coupling fixing nuts to specified torque.

bolts and ENE } Torque t @ Install the 6.0 ~ 6.5 kg-‘m oil — DVB delivery pipe a ae SSF and return No.7 bearing the oil pump by tap- f pipe. 9.3.17. Oil pump and oil pipe @ Install a a dowel pin cap, then assemble + in the ping lightly with urethane hammer. @ Insert the lock washers assembling po c 7 tighten the bolts with specified torque. Torque @ Assemble and the 4.4 kg-m oil suction delivery pipe to oil pump pipe with the EFM ; 20251 by the boits. - 109 -