Ditch Witch RT115 Tier 2 — Plow

100 HOUR SERVICE Use plow lift control to put hydraulic load on pivot joints. Do not raise plow. As hydraulic load is applied and released, visually check joints for motion. If motion is observed, contact your Ditch Witch dealer. As hydraulic load is applied and released, visually check joints for motion. If motion is observed, contact your Ditch Witch dealer. IMPORTANT: Lower plow blade to ground and visually inspect bushings and joints. Replace bushings if there is excessive motion. 186 RT115 Tier 2 - SERVICE Test upper and lower connector pivots every 100 hours. Use hydraulic jack to place load on lower arm. Test Plow Connector Pivots p Lower plow to ground. Lower plow to ground.

To test upper pivot: To test lower pivot: