Komatsu — INDEX

.

INDEX INDEX 3 2 2 12 12 7 INSTALLATION OF CAB INSTALLATION OF ROPS INTRODUCTION 51 52 8 5 68 2 5 8 9 2 2 2 76 7 - 1 POSTURE OF WORK IONER ADJUSTING POSTURE OF WORK EQUIPMENT AIR CONDIT ASHTRAY GAUGES OF MACHINE NTENANCE GENERAL VIEW OF MACHINE GUIDES TO MAI NTENANCE 3 - 3 - 4 - 3 - 120 3 - 53 3 - 52 HANDLING MAC HINES EQUIPPED WITH KOMTRAX BASIC PREC HANDLING OIL, FUEL, COOLANT, AND PERFORMING O HANDLING TRIM MING DOZER EXPLANATIO N OF COMPONENT GENERAL VIE MAINTENANC SPECIFICATI HEATER, HAND BREAKING I N THE MACHIN 6 - 6 - 1 - OCK O, HANDLING ER FINISHING WORK ORE STARTING ENGINE, CAP WITH L CAR STERE CHECK AFT ER FINISHING WORK CHECK BEF ORE STARTING ENGINE, ADJUST EAKER HER OPERATION OLD WEATHER OMPLETION OF WORK IONS FOR LOW TURE EVERS, PEDALS CIRCUIT BR COLD WEAT HER OPERATIO AFTER C OLD WEATHER AFTER C OMPLETION OF WORK PRECAUT IONS FOR LOW TEMPERA CONTROL L EVERS, PEDAL 4 - 6 - 6 - 6 - 6 - 6 - 3 - 5 5 6 5 7 11 59 3 - 49 3 - 60 3 - 126 3 - 76 3 - 47 3 - 137 3 - 139 3 - 139 3 - 131 3 - 131 1 - 7 3 - 137 3 - 38 LOADING, UNLO ADING WORK LOCKING ORAGE AGE RAGE RAGE LONG-TERM ST AFTER STOR BEFORE STO DURING STO N LOCK KET DOOR OPE DOOR POC 3 - 132 3 - 126 3 - 140 3 - 140 3 - 140 3 - 140 3 - 3 - RIAL NO.

PLATE ON OF COMPONENTS POWER SOURCE TYPE EHEATING HEATER ENGINE SE RIAL NO.

PLATE EXPLANATI ON OF COMPONENTS EXTERNAL POWER SOURC E TYPE ENGINE PR EHEATING HEATER 1 - 3 - MACHINE OPER MAIN POWER C IRCUIT BREAKERS MAINTENANCE SCHEDULE CHART ADJUST INJE METHOD OF LIF TING MACHINE 3 - 3 - 104 3 - 47 4 - 16 4 - 18 3 - 135 EL R, LEFT/RIGHT S OF MACHINE FOREWORD FRONT PAN FRONT/REA R, LEFT/RIGHT DIRECTION FUSE 1 - 3 - 1 - 3 - 7 45 NECESSARY IN FORMATION 1 - RECAUTIONS RECAUTIONS IONS RELATED TO GENERAL P GENERAL P PRECAUT IONS RELATED TO SAFETY IEW IEW OF CONTROLS AND GENERAL V GENERAL V IEW OF CONTROLS AND 2 - 6 - 3 - ND CHECKS AFTER INE ECTRIC SYSTEM ERVICE OPERATIONS A ND CHECKS AFTER STARTING ENG OUTLINE OF EL OUTLINES OF S 3 - 100 4 - 8 4 - 5 6 - 3 -