. OPERATION OPERATION OPERATION OPERATION same procedure as above, but in the opposite direction. REMARK 3 - 159 4. lift cylinder repeatedly , then rais e the blad e an d rotate it to the righ t side of the machin e to set t he blade t o the bank cu t position. When setti ng to the bank cut p osture on the left side, use the To improve the banking performance, set stallation position of t he p iston ro d of t he b lade side shift cylinder to the left position when carrying out the banking o n ri ght side, and to he ight positio n when carrying o ut bankin g on the left si