Caterpillar C7 ACERT, C9 ACERT, C11 ACERT, C13 ACERT, C15 ACERT, C18 ACERT, C27 ACERT, C32 ACERT — Caterpillar C7 ACERT, C9 ACERT, C11 ACERT, C13 ACERT, C15 ACERT, C18 ACERT, C27 ACERT, C32 ACERT User Manual

Connectors and Wiring Harness Requirements Figure 5: Service Tool Connector Wiring Diagram Switched Positive Battery Service Tool Connector Negative Battery + Bat. - Bat. P1/J1 ECU CDL + CDL - J1939 + J1939 - J1939 Shield N/C N/C Terminating Resistor NOTE: All 7 wires, J1939, CDL, power and ground as shown in this diagram are required. NOTE: The ECU provides the only ground necessary for the J1939 Shield. Do not apply any other grounding to this line. 5.4 SAE J1939/11 — Data Bus Wiring 5.4.1 J1939 Data Bus Harness Design The data bus connector that Caterpillar uses is a modified DT connector, special wedge, cable, and extended socket.

The harness assembly requirements are unique to typical Caterpillar wire harnesses. Caterpillar recommends 2 conductor shielded cable from Raychem Corp (Raychem part number 2019D0309-0/Cat part number 153-2707) for all J1939 data link wiring. This is twisted pair wiring. If the Caterpillar recommended cable is not used, the cable must meet J1939 specifications for conductors (refer to Table 2). For additional information regarding the electrical system design see the SAE publication J1939/11 “Physical Layer.” The minimum bend radius for the data bus cable is 40 mm. Table 2:

J1939 Conductor Specifications A P P L I C A T I O N A N D I N S T A L L A T I O N G U I D E 37 A B D E G F C H J 8 9 50 34 42 CDL + CDL - J1939 + J1939 - J1939 Shield J1939 SPECIFICATIONS FOR CONDUCTORS Minimum Nominal Maximum Impedance (ohm) 108 120 132 Capacitance between conductors (pF/m) 0 40 75 Capacitance between the conductors and the shield (pF/m) 0 70 110