EVERY 500 HOURS SERVICE * Maintenance for every 100 and 250 hours should be carried out at the same time. a. 1. SWING CIRCLE PINION Remove bolts (1) (2 bolts) on the top of the revolving frame and remove cover (2). Insert a scale into the grease and check that the height of the grease in the portion where the pinion passes is at least 28 mm. Add more grease if necessary. If the grease is particularly milky due to ingress of water, etc., then remove cover (3) from the bottom of the track frame and remove the grease. Replace all of the grease with new grease. The total amount of grease is 21 !? [18.9 kg]. When changing the grease, contact your Komatsu distributor. 2. b.
RADIATOR FINS AND OIL COOLER FINS Clean the radiator fins and oil cooler fins clogged with mud, dust and leaves with compressed air. Steam or water may be used instead of com- pressed air. * The rubber hose should be checked at the same time. If the hose is found to have cracks or to be hardened by ageing, such hose should be replaced by new one. Further, loosened hose clamp should also be checked. * When cleaning, clean the net at the front of the oil cooler also. t On dusty jobsites, carry out this inspection every day regardless of the maintenance interval. * After-cooler fins are installed only to the PC220 and 220LC. - 134-