METHOD OF LIFTING CHASSIS The person performing lifting operations using a crane must have the fol- lowing qualifications. When lifting the chassis, do as follows. 1. Set the wire rope to the following lengths: L = Min. 7 m * When lifting, pay attention to the position of the center of gravity and be careful to maintain the balance. 2. Set the work equipment with the boom cylinder and arm cylinder fully extended. When a bucket is installed, extend the bucket cylinder fully, but when a crusher is installed, set it so that it is perpendicular. Sr Never try to lift the chassis with the undercarriage at an angle to the upper structure. 3.
When the chassis comes off the ground, stop and wait for the chassis to stop swinging, and then lift slowly. A Never allow any worker to ride on the machine while it is being lifted. A Be sure to use a wire rope that has ample strength for the weight of the machine being lifted. - 44 -