. OPERATION MACHINE OPERATIONS AND CONTROLS (B) 3 - 101 17. Before starting operations, r epeat the following operations slowly 3 to 5 times to circul ate warm oil through the contro l circuits. Boom operation R ) ←→ LO Arm operation IN (B) ←→ OUT (A) Bucket operatio n CURL ( D) ←→ D UMP (C) When carrying out swin g operations, relea se swing l ock switch (2), check tha monitor the swing. Swing operation Left (G ) ← → Right (H Travel ( Lo) operation FORWARD (A ) ←→ REVERSE Attachment operatio n One way (A) ←→ Other way (B)