Komatsu — RELEASING PRESSURE

. LOADING SHOVEL PRECAUTIONS WHEN DISASSEMBLING MACHINE PRECAUTIONS WHEN DISASSEMBLING MACHINE RELEASING PRESSURE When disassembling the machine or removing the piping during inspection or maintenance, always release the pressure as follows. Releasing Pressure from Work Equipment Circuit, Swing Circuit, Travel Circuit WARNING 7 - 11 The hydraulic system is alway s under internal pressure, so when inspecting or replacing the pipin g or hoses, always release the pressure in the circuit befo re starting. If the pressure is not released , high pressure oil may s purt out and cause serious personal injury.

The parts and oil are at high te mperature after the engine is stopped, a nd may cause serious burn s. Wait for the temperature to go down before starting the operation. When the oil filler cap is remo ved, oil may spurt out, so turn the cap s lowly to release the pressur e before removing the cap. 1. Stop the machine on firm horizontal ground, lower the wor equipment to the ground a then stop the engine. Set the lock lever at th s shown in the diagram on the right e FREE position. ment control lever to the full strok stopping the engine. ch at the ON position. draulic tank. 2. Operate each work equip within 5 - 6 seconds after Leave the starting swit 3. Remove the cap of the hy 4.

Start the engine, run for a pprox. 10 seconds, then stop the e Do not run the engine a Set the work equipmen t control levers to the HOLD position. 5. Operate each work equip ment control lever to the full stroke within 5 - 6 seconds afte Repeat Steps 4 - 5 thre e times. Releasing Pressure in Ac cumulator Circuit After stopping the engine, set lock lever to the FREE position, the operate each work equipmen t control lever 3 - 4 times to the en of the stroke. After 1 minute, t he internal pressure will be relieved Do not loosen any piping un til at least 1 minute has passed afte relieving the internal press ure.