Komatsu — EVERY 10 HOURS MAINTENANCE

. LOADING SHOVEL MAINTENANCE EVERY 10 HOURS MAINTENANCE (1) (2) (3) (4) (5) (6) (7) (8) (9) Boom cylinder foot pin (2 places) Bucket cylinder rod end (2 places) Bucket-Link coupling pin (2 places) Bottom dump cylinder foot pin (2 places) Arm-Bucket coupling pin (2 places) Link coupling pin (2 places) Bucket hinge pin (2 places) Bottom dump cylinder rod end (2 places) Arm cylinder rod end (1 place) (10) (11) Boom-Arm coupling pin (arm side) (2 places) Bucket cylinder rod end, link connection pin (4 places) Boom centralized greasing block (10 places) (12) Boom foot pin Arm cylinder foot pin Boom cylinder rod end Bucket cylinder rod end Boom-Arm coupling pin (boom side) 7 - 18 LUBRICATTIN 1.

Set to the greasing postu re below, low er the wor k equipment t o the ground , then stop the engine. 2. Using a grease pump, pu mp in grease through t he grease fittin gs shown b 3. After greasing, wipe off a ny old grease that was pushed o