. MAINTENANCE SERVICE PROCEDURE ADJUSTING TENSION OF CENTER BRACE (Power tilt dozer) (Powertilt, Power pitch dozer) (Semi-U dozer) WARNING side. At that time, adjust clearance 4 - 48 In c ase the w ork equipment asse mbly is disassemble d for transportatio n and r eassembled at a worksite, tension of the center br ace has to be adjust ed anew. Otherwise t he bushing at the connecting part of blad e and straight frame will likely slip off, allowing sand a nd dirt to enter the bu shing, w hich eventually leads to prema ture wear or damage of t he bushin g. Make this adjust Except when o perating the blade in S tep 4, always lock the blade control lever s ecurel y with the work eq 1.
Adjust wi th shim (2) so that th e play of ball joint (1) is 0.2 to 0.7 mm (0.0 08 to 0.028 in). ils of the method of adjusting, see "ADJUSTING (PAGE 4-46)". er to float the blade. For deta SHIMS A T CENTER BRACE 2. Loosen b olt (3). e blade assembly. 3. Install th 4. Operate the blade control lev er to float the blade. 5. Insert th e bar in center brac e hole (4) and turn t he bar t o the protruding between the track shoe and frame (A) so that it is equal o n the righ t and l Rotating torque: 24.5 to 49 N m (2.5 to 5 kgm, 18. 1 to 36. 2 lbft) (Blade at Standard distance between t he joints (B) is as sh own below. D65EX: 995mm (39.2 in) 992mm (39.1 in) 995mm (39.2 in) olt (3). D65PX: D65WX:
6. Tighten b Tightenin g torque: 490.3 to 6 08 Nm (50 to 62 kgm , 361.7 to 448.4 l bft