Tighten the spider to specification using the clutch spider separator (bar wrench) 3 . The spider has a left-handed thread. WARNING Do not operate the primary sheave until the LOCTITE has dried completely. Wait 24 hours before operating the primary sheave. Since a high torque is required to tighten the spider, make sure the spider, fixed sheave, and special tool are well secured. Tighten the spider carefully to prevent cracks and damage to the sheaves and spi- der. 5. Install: Weight 6. Install: Primary sheave spring 1 Primary sheave cap 2 NOTE: Be sure the sheave cap match mark (X) is aligned with the spider match mark (X).
Be sure to use the flange bolts 3 to position a to maintain the balance of primary sheave. 4-8 PRIMARY SHEAVE AND DRIVE V-BELT POWR TR Spider: 200 Nm (20 mkg, 145 ftlb) CAUTION: CAUTION: Nut 1 : 6 Nm (0.6 mkg, 4.3 ftlb) NOTE: To maintain the primary sheave balance, the bolts 2 must be installed with their threaded portions pointing in a counterclockwise direc- tion, as illustrated. Primary sheave cap bolt: 14 Nm (1.4 mkg, 10 ftlb)