ESS00123 INSTALLATION 1. Install: Primary sheave assembly CAUTION: Be sure to remove any oil or grease from the tapered portion of the crankshaft and spider using a cloth dampened with thinner. 2. Apply: YAMALUBE 2-cycle oil or an equivalent grease (to threads of primary sheave bolt) 3. Tighten: Bolt (primary sheave) 1 Tightening steps: Hold the primary sheave 3 using the primary sheave holder 2 and tighten the bolt (primary sheave) to specification. Bolt (primary sheave) 1 : (initial tightening) 120 Nm (12 m kg, 87 ft lb) Loosen the bolt (primary sheave) completely. Retighten the bolt (primary sheave) to specifi- cation. 4. Adjust: V-belt position Refer to “DRIVE V-BELT” in CHAPTER 2.
Sheave distance Sheave offset Secondary sheave freeplay (clearance) Refer to “SHEAVE DISTANCE AND OFF- SET ADJUSTMENT” in CHAPTER 2. 4-9 PRIMARY SHEAVE AND DRIVE V-BELT POWR TR Primary sheave holder: 90890-01701, YS-01880 Bolt (primary sheave) 1 : 60 Nm (6.0 mkg, 43 ftlb)