. MAINTENANCE MAINTENANCE PROCEDURE CHECK AND TIGHTEN TRACK SHOE BOLTS loose, they will Tightening shown in right. contact 4 - 29 I f the machine is used with track s hoe bolts (1) break, so tighten a ny loose b olts immediately Triple shoe, swam p shoe, fla t shoe, rubber p ad shoe 1. Fir st tighten to a tightenin g torqu e of 490 ± 49 Nm (50 ± 5 kgm, 360 ± 36 lbft) then check t hat the nut an d shoe in close co ntact with t he link contact surface. 2. Aft er checking , tighten a further 120 ° ± 1 Order for Tighteni Tighte n the bolts i n the After ti ghtening, c heck that th with th e link matin iagram he shoe are in close