Komatsu — CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR CONTROL CIRCUIT)

. MAINTENANCE MAINTENANCE PROCEDURE CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR CONTROL CIRCUIT) WARNING carried out. pressure in the control circuit. Even for the work equipment to go down The accumulator is installed to the position shown in the diagram 4 - 74 The a ccumulator is charged wi th high-pressure nitrogen gas, so mistaken operation may cause an explosion, which will lead to seriou s injury or damage. Whe n handling the accumulator, always do as follows. Th e pressure in the hydraul ic circuit cannot be completely removed. When removing the hy draulic equipment, do not stand he direction that the oil s purts out when carrying out the operation.

In addition, loosen th e bolts slowly when carrying out operation. Do not disassemble the acc Do not bring it near flame o Do not make holes in it or w Do not hit it, roll it, or subje Wh en disposing of the acc umulator, the gas must be released. Please contact your Komat su distributor to have this work NOTIC E If the nitrogen gas charge pres sure in the accumulator is low and operations are continued, it w ill become impossible to release the re maining pressure inside the hydraulic circuit if a failure occurs on the machine.

FUNCTION OF ACCUMUL The a ccumulator stores th after the engine is stopped, the fo llowing actions are po If t he control lever is ope eq un uipment, it is possibl der its own weight. Th e pressure in the hyd on th e right.