MAINTENANCE Service procedure Every 250 hours service Lubricating 0. 1. Using a grease pump, pump in grease through the grease fittings marked by the arrows. 2. After greasing, wipe off any old grease that was pushed out. NOTICE On jobsites where there is a lot of heavy-duty work, or on jobsites where operations are carried out contin- uously for more than eight hours, reduce the greasing interval and carry out greasing more frequently. (1) Bucket pin (2 places) (2) Bucket link pin (2 places) (3) Dump cylinder pin (2 places) (4) Lift cylinder pin (4 places) (5) Lift arm pivot pin (2 places) (6) Tilt lever pin (1 place) (7) Steering cylinder pin (4 places) 4-43