hitachi — Operation

COMPONENT OPERATION / Ride Control Valve OPERATION 1. In neutral, port Pi and the ouput port are not connected via the spool. 2. When the signal from MC (Main Controller) enters the solenoid, the solenoid is excited. 3. As the solenoid pushes the spool with the force corresponding to the signal from MC, port Pi and the output port are connected and pilot pressure oil pushes the main spool. 4. When the main spool is pushed toward spring 2, port A (the bottom side of the lift arm cylinder) and the ride control accumulator are connected, and port B (the rod side of the lift arm cylinder) and port T are connected. 5.

Therefore, the pushing force of the lift arm cylinder is absorbed by the accumulator, and the load generated by the pushing-up force is absorbed by drawing hydraulic oil from the tank port. Section A * To Ride Control Accumulator Port Pi Spool Pilot Pressure Port A Port B Spring 1 Output Port Spring 2 T4GB-03-08-006 *: Refer to T3-8-1. Tank Port Main Spool T3-8-4