DOOSAN ŠKODA POWER — DOOSAN ŠKODA POWER Steam Turbine Assembly Manual

Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika Preparation and taking over of the Přнprava a převzetн zбkladu: · Vyznačenн os: Prostudujte vэ kresovou dokumentaci uvedenou v kapitole č. 1.3, namontujte stojбnky pro vytyčenн podйlnй a přнčnэch os turbosoustrojн, napněte struny na připravenй stojбnky a zakreslete osy turbнny na povrch betonu hornн zбkladovй desky turbosoustrojн dle platnй vэkresovй dokum entace (tj. osy těles a ložiskovэch stojanů parnн turbiny, osu vstupu pбry a osy těles ventilů VT a ST RZR ). Krajnн body a průsečнky os nechte vždy vyznačit barvou sprejem.

· Instalace vэškovэch (nivelačnнch) bodů: Našroubujte nivelačnн čepy do jнmek připravenэch v zбkladu TG stavebnн firmou, jнmky musн bэt pevně přivařenй k armovбnн. Nastavte vэšku nivelačnнch čepů přibližně na stejnou ъroveň šroubovбnнm (hrubб nivelace) zajistěte jejich polohu svarem , nakonzervujte je (Cortec) a nasaďte jejich vнčka. Nivelačnн čepy budou sloužit pro měřenн metodou Velmi přesnй nivelace (VPN) . Na sloupech zбkladovй stolice nechte vyznačit referenčnн vэškovou kytu, ve strojovně nechte vyznačit referenčnн body vně turbostolice. Vэškovй body na sloupech a ve strojovně nechte vyznačit barvou sprejem. foundation: · Marking of the axis:

study the drawing documentation mentioned in chapter no.1.3, assemble the stands for the stocking out of longitudinal and transversal axis of turbo-set, tense the strings on the arranged stands and draw the axis of turbine onto the surface of concrete of the upper foundation slab of turboset according to drawing documentation. (axis of turbine casing and bearing stands of turbine, axis of steam inlet, axis of HP and IP Control&Stop valve bodies). Let the end-points and the points of intersection to be marked by colour-spraying. · Installation of the altitude (leveling) points:

Screw up the leveling pegs into the cofferdam prepared by civil work contractor in TG foundation, the bushing has to be properly welded to the reinforcement. Set up the height of the leveling pegs by the screwing approximately at the same level (rough leveling) lock their position by weld, apply the preservation (Cortec) and put their cups on. Level pegs will serve for measuring by method Very precise leveling (VPL). Let to mark the altitude reference point on the columns of the foundation stool, let mark the reference points in machine hall out of the foundation stool. Let to mark altitude points on the columns and in the machine hall let mark by a colour spraying. Date:

12.11.2013 Page 115 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ Detail procedure of assembly activities / Detailní popis montážních činností 2.11.1 Installation of the anchor components and the bearing stands of turbine / Montáž kotevních dílů a ložiskových stojanů turbíny