Deutz — Removing and installing the exhaust gas collection pipe (Exhaust gas recirculation)

Exhaust system/Charging D 2011 W 06-09-08 ●Mount gasket (1). Make sure that the installation site of the mounting lugs (2) is in perfect condition. 2 2 1 6 © 46951-0 ●Mount new gaskets (3). ●Mount new throttle (2). Note installation position. The marking (arrow) on the throttle is dependent on the engine version. 3 2 ●Insert exhaust gas collection pipe. 1 ●Turn in new screws (1). © 46952-1 ●Turn in new screws (1). ●Tighten new screws (1). 55 Nm 1 © 46946-0 © 01/2009 OBJ_DOKU-23500-001.fm 3/6