Recovery, Loading and Transporting 6 6.2 Loading the machine by use of a crane Danger to life due to exceeding the maximum weight-lifting capacity. Ensure that the maximum lifting capacity of the crane and the crane harness is not exceeded. To load the machine by use of a crane, the following preparations are required: Empty the bucket and tip back. Move the lift frame to travel position. Apply the pin of the articulation lock (33/1 on the articulation). Lower the work tool onto the ground. Switch off the engine. Dismount from the machine and close the doors. Attach the loader to the hoisting appliance at the specified, marked points (Fig. 33) in the correct manner. 1 Fig.
33 Crane suspension 6.3 Transport of the machine To transport the machine onto a flat bed trailer, railway goods wagon, etc. the following measures must be taken: Empty the bucket and tilt back. Drive the machine onto the flat bed trailer, goods wagon, etc., or lift by crane if required. Apply the pin of the articulation lock (34/1 on the articulation). Lower the work tool onto the ground. Switch off the engine. Dismount from the machine and close the doors. Attach the machine at the points illustrated (Fig. 34) in the correct manner. Danger to life due to disregarding the total transport height. It is essential to observe the clearance heights of tunnels, bridges, etc. 1 Fig.
34 Lashing for transport 61/112 TL160 Operating Manual 12.9.08 Version 1.0