24. SERVICE PROCEDURE 2. Accelerator pedal linkage (2 points) If the accelerator pedal is heavy or does not return properly, apply grease. NOTICE Supply grease to following items 3 – 8 below every 10 operating hours or every day for the first 50 operating hours until the pins are braked on the new machine. 3. Bucket pin (2 points) 4. Bucket link pin (2 points) 5. Lift arm hinge pin (2 points) 6. Bucket cylinder pin (2 points) 7. Tilt lever pin (1 point) 3-34