Komatsu — OPERATING METHOD FOR RIPPING OPERATIONS

. OPERATION OPERATION OPERATION OPERATION 3 - 134 During the ripping operation, if there is an y hard bedrock, carry out ripping in the opposite di rection to th e directio n where the ripper was applied . If it is stil l impossible to break up the rock, break u When p the area carrying ou around the bedrock a lit t concentrated ripping tle at of har the d b work ef ficiency is high if the ripper is appli ed to t he whole of the digging face.