Komatsu — LOADING, UNLOADING WORK

. OPERATION TRANSPORTATION OPERATION TRANSPORTATION it in position. bending. 3 - 146 3) Install a shackle to the un dercover hook at the front of the diagram on the right (a), then e rope. er mount pin at the rear of the iagram on the right (b) to secure 4) Protect the wire from cont acting directly with angular parts of the machine, by ins UNLOADING 1. Load and unload on firm leve l ground only. Maintain a safe distance from the edge o 2. Apply the trailer brakes secur ely, then put blocks (1) under the tires to prevent the trailer from moving. (2) parallel to each other and Set left and right ramps nd right of center (3) of the trailer. (4) a maximum of 15°.

If the ount under the weight of the the ramps to prevent them from 3. Remove the chains and wire 4. Start the engine. Warm the engine up fully. Set main work equipment lock lever to FREE position (F), and raise the work equipment. (When transporting with work