. ATTACHMENTS, OPTIONS EFFECTIVE METHOD OF OPERATION FOR DUAL TILT DOZER PUSHING-UP SOIL LEVELING (SPREADING) OPERATION be spread smoothly.) REMARK stroke, the move the cylinder back slightly from the end of its stroke to the S pitch position. 6 - 10 1. Dig with S pitch. When digging gradually, use R pitch. If the ground is hard, use F pitch. Haul with R pitch. If 2. If there is any spillage of soil over the top of the bla 3. Dump the soil with F pitch. This dumps the soil more effectively, and less soil Carry When carry out this operation with R pitch, the end bit d in , If the tilt cylinder is moved completely to the end of its ti lt