. INDEX INDEX ADJUSTING POSTURE OF WORK 2 5 7 49 11 9 5 9 2 2 2 3 2 2 HANDLING HYDRAULIC RELATED 8 22 22 INSTALLED 22 5 53 54 48 EFFECTIVE METHOD OF OPERATION 12 10 12 7 - 1 PLATE EXPLANATI ON OF COMPONENTS 1 - 3 - 10 5 3 - 137 3 - 65 3 - 54 , HANDLING AIR CONDITIONER , HANDLING ASHTRAY FOREWORD FRONT PAN FRONT/REA LEFT/RIGHT DIRECTION S OF MACHINE FUSE BOX 1 - 3 - BLADE SERIAL NO .
PLATE POSITION BREAKING IN THE 1 - 1 - 1 - 3 - CAP WITH LOCK, H METHOD OF OPENING CLOSING CAP W CAR STEREO, HAN CHECK AFTER FIN ISHING WORK CHECK AFTER ST OPPING ENGINE CHECK ADJUS COLD WEATHER O AFTER COLD W AFTER COMPLE TION OF WORK PRECAUTIONS TEMPERATURE CONTROL LEVERS GENERAL P RECAUTIONS GENERAL P RECAUTIONS PRECAUT SAFETY IEW VIEW OF CONTROLASND GENERAL V GENERAL VIEW OF C ONTROL AS ND GAUGES VIEW OF MACHINE MAINTETNANCE GENERAL VIEW OF MACHINE GUIDES TO MAINTETNANCE 6 - 2 - 6 - 6 - 5 56 5 3 - 56 3 - 120 3 - 120 6 - 3 - 3 - 3 - 4 - 3 - 71 3 - 154 3 - 156 3 - 155 3 - 154 3 - 38 EQUIPMEN HANDLING WITH VHMS VHMS TERMINA L INSTALLE VHMS INSTALLED, TERMINA NL OT 4 - 6 - DOOR OPEN LOCK DOOR POCKET NDICATOR DUST I 3 - 3 - 3 - 6 - 6 - HANDLING PERFORMI NG OIL CLINIC COOLANT, AND 4 - FOR DUAL TILT DO BLADE CONDITI BOULDER RAISI NG OPERATION DITCHING OPER DOZING WORK HORIZONTAL OPERATIONS F DOZING ROM SIDESLOPE D) (SPREADING) (ROUGH GROUN LEVELING OPERATION OPERATIONS E OF MODE EM S, ENGINE NUMBER SIDE-CUTTING OPERATIONS EFFECTIVE US MODE SELECTION SYST EPA REGULATION S, ENGINE NUMBER 6 - 6 - 6 - 6 - 6 - 6 6 11 11 8 INSTALLATI ON OF CAB INTRODUCT 3 - 152 1 - 7 LOADING, U NLOADING WORK LOCKING STORAGE TORAGE STORAGE STORAGE LONG-TERM STORAGE AFTER S TORAGE BEFORE DURING 3 - 144 3 - 120 3 - 157 3 - 157 3 - 157 3 - 157 6 - 6 - 6 - 3 - 124