Deutz — Deutz 2011 Workshop Manual Level 3

2011 Exhaust system / Charging W 06-06-04 W 06-06-04 Remove and install turbocharger Tools - Commercial tools Note Collect drained operating materials in suitable vessels and dispose of according to regulations. 9090 - Clamping pliers Auxiliary material - DEUTZ S1 Remove turbocharger 6 z If available, remove the bleed pipe (1) and reducer (2). Unscrew screws (3). z Loosen pipe clip (4), remove reducer with bleed pipe. z Unscrew screw (1) and remove holder. © 11/2004 0312 1590 - 0138 1/6 3 1 3 2 4 © 39394 0 © 39394 0 1 © 39395 0 © 39395 0