Deutz — Deutz 2011 Workshop Manual Level 3

5 Job card overview 5.1 Sorted alphabetically 2011 5 0312 1644 - 0138 4/6 © 11/2004 Activity Job card Maintenance group Dismantle and complete front cover (speed governor without torque adaption) W 03-08-03 Crankcase Machine valve seat ring I 01-07-07 Cylinder head Remove and install air intake pipe W 06-07-03 Exhaust system / Charging Remove and install cable harness W 13-01-02 Electrical system Remove and install camshaft W 04-05-05 Engine control Remove and install camshaft bearing, check W 03-11-01 crankcase Remove and install charge pressure-depedent full load stop (LDA) W 07-08-02 Fuel system Remove and install connection housing W 03-09-04 crankcase Remove and install cooling blower W 09-11-01 Cooling system Remove and install crankcase W 02-04-01 Drive system Remove and install crankcase bleeding W 03-01-11 crankcase Remove and install cylinder head W 01-04-04 Cylinder head Remove and install exhaust manifold W 06-01-05 Exhaust system / Charging Remove and install flywheel W 12-06-01 Other components Remove and install front cover (opposite side to flywheel) W 03-08-01 Crankcase Remove and install fuel filter console W 07-10-08 Fuel system Remove and install fuel lines (with Bosch injection pumps) W 07-10-06 Fuel system Remove and install fuel lines (with leak fuel line) W 07-10-06 Fuel system Remove and install fuel pump W 07-11-01 Fuel system Remove and install generator (in FL and BFL engines) W 13-02-03 Electrical system Remove and install generator and holder (in FM and BFM engines) W 13-02-03 Electrical system Remove and install control linkage and guide bushes W 07-02-06 Fuel system Remove and install helical heater plugs W 13-06-01 Electrical system Remove and install hydraulic pump W 12-08-02 Other components