Deutz — Deutz 2011 Workshop Manual Level 3

5 Job card overview 5.3 Job card references 2011 07 Fuel system 5 0312 1646 - 0138 7/10 0312 1646 - 0138 Job card Activity Other job cards necessary for performing the activity W 07-02-06 Remove and install control linkage and guide bushes W 03-08-01 W 03-09-04 W 07-04-01 (Motorpal) W 07-04-01 (Bosch) W 07-08-02 W 08-11-12 W 09-11-01 W 13-02-03 W 07-02-07 Remove and install lifting magnet for start volume release W 07-03-01 Renew injection lines W 08-08-02 W 07-04-01 Remove and install injection pumps (Bosch) W 07-03-01 W 07-06-04 W 07-10-06 W 07-04-01 Remove and install injection pumps (Motorpal) W 07-03-01 W 07-06-03 W 07-06-04 W 07-10-06 W 07-06-03 Determine the thickness of the shim gasket W 07-04-01 W 07-06-04 Check start of pumping W 07-03-01 W 07-10-06 (Bosch) W 07-10-06 (Motorpal) W 11-00-03 W 07-07-01 Remove and install injection valves W 07-03-01 W 07-07-02 Check and repair injection valve W 07-07-05 W 07-07-01 W 07-07-05 Checking and setting injection valves (leak fuel- less) W 07-07-01 W 07-08-01 Remove and install solenoid valve (LDA) W 07-08-02 Remove and install charge pressure-depedent full load stop (LDA) W 07-10-06 Remove and install fuel lines (with Bosch injection pumps) W 08-08-02 W 07-10-06 Remove and install fuel lines (with leak fuel line) W 07-10-08 Remove and install fuel filter console