Daewoo Heavy Industries B20S-2, B25S-2, B30S-2, BC20S-2, BC25S-2, BC30S-2 — Table of Contents

5 6 12 13 21 15 22 17 11 7 9 8 3. Use a hammer and punch to remove roll pin (6) from the carrier. Remove pin (8), side gears (7) and the thrust washers. 20 23 19 18 IDCD356S 4. Remove axle gears (9) and the thrust washers. If bearing cones (5) need to be replaced, use tool (B) and a press to remove them from the carrier. 6. Remove outer bearing cone (17), shims (23) and ring (22) from the pinion shaft. Pull pinion shaft (12) out of gear (15) and the housing assembly. Remove ring (21) from the pinion shaft. Remove the gear from the side of the housing assembly that cover (10) was removed from. 7. If necessary, remove inner bearing cone (13) from the pinion shaft with a press. 10 8.

If necessary, remove bearing cups (18) and (20) and shim (19) from the housing assembly. 11 5. Remove cover (10) from the housing assembly. Remove the cap from over pinion nut (11). Bend the lockwasher away from nut (11). Remove nut (11) with tool (C). Remove the lockwasher and washer. 24 25 26 9. Remove the snap ring (24) from the gear shaft (26). 10. If necessary, remove the bearings (25) from the gear shaft (26) with a bearing puller. Power Train Disassembly & Assembly 40