Daewoo Heavy Industries B20S-2, B25S-2, B30S-2, BC20S-2, BC25S-2, BC30S-2 — Table of Contents

Final Drives And Hubs Remove Final Drives And Hubs 10 11 Start By: a. Remove brakes. 26. After all the adjustments have been completed, put Bearing Mount Compound on the outside diameter of cap (11) and install it. 2 3 27. Put Gasket Maker on cover (10) and the housing assembly. Also, use Quick Cure Primer if the temperature is below 10 ° C (50 ° F). 1 End By: 4 a. Install power transfer group. 1. Bend back one of the tabs in locking washer (1). 2. Remove nut (3) with tool (A). Remove locking washer (1) and bearing (2). 3. Remove cover and hub assembly (4). 5 4. Remove bearing cone (5) from the spindle. Power Train Disassembly & Assembly 45 Tools Needed A Spanner Wrench 1